Sunday, July 26, 2009

Almost done!

So much has happened since I last posted! We've been busy finishing up the details of the house and packing for the move.

Here's what is left to do:

  • Final building department inspection!
  • Wash windows, including window frames.
  • Mount recharge station in mudroom.
  • Figure out shelving/hooks/cubbies for mudroom storage.
  • Hang temporary curtain in downstairs bathroom (need a 24" tension rod).
  • Fix oversized electrical boxes behind three porcelain wall sconces (girls' room and guest). Also fix sewing room ceiling. (Leigh coming Tuesday.)
  • Repaint what Leigh fixes.
  • Touch up copper paint along baseboard in downstairs bathroom.
  • Touch up oops paint spots on all ceilings.
  • See what's in box from cabinet company that's sitting on 18" kitchen cabinet and install.
  • Wipe clean inside of kitchen cupboards.
  • Make sure plumber finished downstairs bathroom sink sprayer and dishwasher installation.
  • Turn on water heater (when it's inspected Thursday morning ask how).
  • Clean vintage light fixtures that are already installed.
  • Wait for Rejuvenation package to arrive (expected July 31) and install beaded chain fixture.
  • Recoat trim under stair railings.
  • Touch up golden fleece paint around stair railings and edge trim.
  • Install stair railing for final inspection. Tighten handrail on left.
  • Decide on internet service and arrange for installation.
  • Wipe clean bathtub.
  • See what's needed for new plugs on stove and dryer.
  • Touch up blue paint around stained glass window in girls' room.
  • Pick up any loose hardware around the house.
  • Clean up linoleum scraps.
  • If time, cut linoleum scraps for under sinks.
  • General cleanup.
  • Clean off front porch.
  • Empty kitchen and upstairs bathroom cabinets.
  • See what's wrong with vintage kitchen light (one of three bulbs not working).
  • Install mailbox.

In preparation for the move:

  • Green table is 34" wide. Check to see if there's enough space for comfortable seating in breakfast nook.
  • Measure stairway to see if queen bed will fit upstairs (bed is 5' wide). If not, either devise complicated pulley system, dangerous ladder or loader tractor scheme, or panic.
  • Double check width of downstairs bathroom. Room for huge open pantry (4'1" wide)? Also consider height.
  • See if mudroom door will swing open wide enough with pantry in front of window (would start 11" from door and is 17" deep).
  • See how long dining room wall is along stairwell. How many inches of bookcases will fit before it's open to railing?
  • Line up U-Haul, vehicles and helpers.
  • Hang room layouts so everyone knows what goes where.

Fat chance we'll have time, but if we do we should ...

  • Repaint the green table legs to high-gloss Jersey Cream. Edge trim semi-gloss Dover White.
  • Paint the preschool locker unit to match the dining room (either Blonde or semi-gloss Dover White).
  • Hang pegboard in sewing room.
  • Maybe repaint girls' closet doors correct Superwhite color if time.
  • Stain the mailbox post.